Get a consultation
To apply, please fill in your contact information
это поле обязательно для заполнения
Строка ввода:*
это поле обязательно для заполнения
Телефон:*
это поле обязательно для заполнения
E-mail:*
это поле обязательно для заполнения
Галочка*
Спасибо! Форма отправлена
Главная/News/Our Projects/Technical Due Diligence for Bash 500 MW and Djangeldi 500 MW wind power plants (WPP).

Technical Due Diligence for Bash 500 MW and Djangeldi 500 MW wind power plants (WPP).

Technical Due Diligence for Bash 500 MW and Djangeldi 500 MW wind power plants (WPP).

Technical Due Diligence for Bash 500 MW and Djangeldi 500 MW wind power plants (WPP).

🔸Bash and Djangeldi wind power plants, located in Bukhara province, are investment projects to be designed, financed and built by International Company for Water and Power Projects (ACWA Power) under PPP mode.
📌The projects are one of the largest WPP in the world with a preliminary estimated cost of USD 650 mm and USD 650 mm for Bash WPP and Djangeldi WPP, respectively (according to Presidential decrees numbered PD-5003 (https://lex.uz/docs/5304170) and PD-5001 (https://lex.uz/ru/docs/5304154)), with installed power generation capacity of both as 1000 MW.

🔹Index Consulting Company together with partners, conducted a technical due diligence comprised of: study of transmission lines, grid connection points, substation locations, possibilities and restrictions for construction of the both Bash and Djangeldi WPP for the ACWA Power (the client).

Address:
Building 29, Shivli str., Yunusabad dstr., Tashkent, Uzbekistan, 100084
/
4
/
4
Submit your application
To apply, please fill in your contact information
это поле обязательно для заполнения
Строка ввода:*
это поле обязательно для заполнения
Телефон:*
это поле обязательно для заполнения
E-mail:*
это поле обязательно для заполнения
Галочка*
Спасибо! Форма отправлена